Page 24 - TNB_Ebook_ESG_2024
P. 24

https://www.tnb.com.my/sustainability/esg-stories/






                                                                 Water Management



                                                             Effective management of makeup water and blowdown is   TNB Genco Thermal Power Plants Located
                                                             paramount for ensuring optimal boiler performance,
                                                             overall power plant efficiency, and safety. The careful   at Low Water Stress Area
                                                             control and quality assurance of makeup water are
                                                             fundamental; any inadequacy or impurity in this supply may   All our coal and combined cycle power plants are located in areas
                                                             not only compromise efficiency but also pose significant safety   with low water stress, none of them are located in the  water
                                                             hazards within our operations.                      stress area, therefore zero (0) water withdrawals from
                                                                                                                 water-stressed regions. This strategic placement highlights
                                                             From 2023 to date, average Water Intensity (water   our commitment to sustainable resource usage and community
                                                             consumption from town water source per net generation of   harmony, preventing potential conflicts over water resources
                                                             respective plant) for our power plants are much lower than
        Note: The diagram above includes Hydro Power Plant                                                       between industry and local communities. The process begins
                                                             our counterparts using similar power plants technology. This   from planning and construction of the respective thermal power
        Closed-Loop Steam Generation Process Helps to        is illustrated in the following table:              plants.
        Optimize the Use of Town Water Withdrawal                                                                In addition, all of our coal and combined cycle power plants
                                                                                                                 were built and continue to operate in accordance with global
        As  pioneers  of  ‘Combine  Cycle Gas  Turbine’  and  ‘Ultra                                             “World Bank Environmental and Social Standards” which were
        Super Critical Boiler’ technology in South-East Asia, we are                                             established based on the initial project bidding requirements.
        dedicated to operational excellence. Water consumption                                                   These standards include water consumption process which are
        plays  a pivotal role  in  our steam  generation  process  and                                           archetypical of conventional high-efficiency thermal plants.
        operational efficiency, designed as closed-loop system aimed                                             Additional efforts at the operational level illustrate our
        at minimising our reliance on town water sources. While                                                  commitment and unwavering dedication to responsible resource
        make-up water is only needed to cover any losses due to                                                  management underscoring our proactive efforts in fostering
        blowdown or vent in maintaining water quality. This system is                                            sustainability within our operations.
        crucial for sustainable operations as it significantly reduces   Table comparison of power plant water consumption intensity of TNB Genco
        our water withdrawal from town water.                Thermal Power Plants and International Counterparts








        Simplified process of feedwater for steam generation




                                    Carbon Management  Water Management   Biodiversity & Land Use  Opportunities in RE  Toxic Emissions & Waste
                          Human Capital Development  Health & Safety  Labour Rights  Supply Chain Management  Community Relations  Corporate Governance
   19   20   21   22   23   24   25   26   27   28   29